KnockDesk

what is idle time in field sales

Minutes on the clock with no knock

What is idle time in field sales is time on the clock with no knock. Knockdesk is field sales software that stores that stall as idle_minutes in capacity analytics, next to clocked minutes and active minutes. Clocked In versus Knocking are shift states, not a second hours column.

Book a Walkthrough
Definition. Idle is the stall on the shift, not the walk.
PieceWhat you count
DefinitionMinutes on the clock with no knock. The shift is running. The door is not.
ClockedThe whole shift. Attendance. Includes idle, break, and the walk.
ActiveMinutes on the route. Pace uses this, not the lot.
Idle_minutesThe stall capacity analytics stores. Clocked minus the work still leaves this.

The stall

A full clock with no knock is still a shift, not a day on turf

You feel it when Maya was Active for six hours and the map shows twelve knocks. What is idle time in field sales is the gap between the clock and the door. If you read only Clocked In, the day looks full. If you read Knocking, you see whether the shift ever stood on a porch. Those two labels are states. Idle_minutes is the count.

  • Clocked In

    The shift started. Location was required to clock in. This is attendance, not pace.

  • Knocking

    The state at the door. It is not a second hours column next to Clocked In.

  • Idle

    The live state when the clock is on and the knock is not. Capacity analytics sums it as idle_minutes.

Six hours

Three hundred sixty clocked, ninety idle, two utilization stories

Maya clocks 360 minutes. Active minutes are 240. Break is 30. Idle_minutes are 90. 240 plus 90 plus 30 is 360. Utilization as active over clocked is 240 / 360, which is about 67 percent. If you fold idle into active you get 330 / 360, about 92 percent, and you have hidden an hour and a half with no knock.

Recompute the shift. 360 clocked minutes stay fixed. Only idle changes the story.
BucketMinutesHow to read it
Clocked360The shift. Six hours.
Active240The walk. Four hours.
Idle_minutes90No knock. An hour and a half.
Break30On Break. Not idle, not the walk.
Active / clocked240 / 360About 67 percent. The honest utilization.
If idle is treated as active330 / 360About 92 percent. The stall disappeared.

The split

Idle is not knocks per hour, and it is not a break

Knocks per hour divides knocks by active route hours. A break is On Break. Idle is the clock with no knock and no break. Mixing those three into one hours number hides whether the crew walked, sat, or stopped on purpose.

  1. 1Clock in with location. The shift shows Clocked In.
  2. 2Start the route. Active minutes can accumulate on that walk.
  3. 3Take Break when you stop on purpose, then End Break.
  4. 4Read idle_minutes beside clocked and active. Do not fold the stall into the walk.
  5. 5Read Clocked In versus Knocking as states on the live shift, not as two hours columns.

Capacity

How Knockdesk tracks it

Capacity analytics stores idle_minutes next to clocked minutes and active minutes. Clocked In versus Knocking are shift states. There is no separate working-time versus knocking-time hours column. Full desk is on the pricing page.

Visit

Sample

Appointment

Maya Chen

Homeowner asked for a Thursday return. Recording marked kept.

Related

Keep going from the stall

FAQ

Frequently asked questions

What is idle time in field sales?

Idle time in field sales is minutes on the clock with no knock. In Knockdesk, capacity analytics stores that count as idle_minutes next to clocked and active.

How is idle different from a break?

A break is On Break, with Take Break and End Break. Idle is the clock running with no knock and no break.

Should I divide knocks by clocked hours?

Not if you mean pace. Knocks per hour uses active route hours. Clocked hours include idle, break, and the lot.

What is Clocked In versus Knocking?

They are shift states. Clocked In is attendance. Knocking is the state at the door. They are not a second pair of hours columns.

How do you recompute the example?

360 clocked, 240 active, 90 idle, 30 break. Utilization is 240 / 360, about 67 percent. Folding idle into active makes 330 / 360, about 92 percent.

How much does Knockdesk cost?

Full desk is on the pricing page. A free trial is not open.

Book the stall

Bring the shift that looked full only on the clock.

We will split idle_minutes from active time and price Full desk. A free trial is not open.

Book a Walkthrough